Moving from field evidence to a development programme.
Documented artisanal workings within EL-72885 provide a tangible starting point for investigating tin mineralisation.
The supplied TML reconnaissance, mapping and follow-up sampling reports record artisanal activity and preliminary concentrate screening. The recovered heavy-mineral fraction was interpreted as cassiterite-dominated.
The next development decisions depend on representative sampling, laboratory verification and recovery testing.

Evidence, stage and next steps.
Location
Nasarawa-Eggon, Nasarawa State. Exploration title 72885 EL has a documented area of 20 km².
Work to date
Reconnaissance, mapping and follow-up artisanal sampling are described in the supplied TML reports.
Next programme
Verify grades, distribution and recovery characteristics, then evaluate a tin-concentration route supported by the results.
Preliminary concentrate readings are not deposit grades. No mineral resource, reserve or project economics are declared here.

From observed material to verified results.
The report records recovered heavy-mineral concentrates alongside field mapping and artisanal observations. This photograph provides source context; it does not establish deposit grade, mineral resources or production volumes.
Laboratory confirmation and representative sampling remain central to the next programme.
Explore AFROLEAD. Connect with our leadership.
For company information, project discussions and strategic relationships.
Read the basis for the next programme.
Review the completed work, the interpretation of the results and TML’s recommended next steps.
